Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/dixonstreetransplanting.com.au/htdocs/wp-includes/functions.php on line 6121
Seamless Fan Palm Relocation at Circular Quay

Metrocorp enlisted us to assist them with a large-scale transplanting job in Circular Quay. We co-ordinated 9 large Fan Palms to be carefully relocated from the tight location, with the assistance of a 25 tonne Franna crane, and moved to a temporary holding nursery. The works were accomplished seamlessly, allowing Metrocorp to begin rehabilitation to a heritage listed stormwater culvert.

Workers examining palm tree under bridge